PROJECT I
|
|
|
|
The Project I wing (formerly Tamil
Nadu Urban Development Project) was
formed in October 1988, exclusively for carrying
out the works under TRAMP (Traffic and Transport
Management Programme) component of TNUDP with Loan
assistance from World Bank.
|
|
|
|
In respect of TRAMP component, all
the works have been completed except Northern Sector of
Inner Ring Road and Southern Sector of Inner Ring Road,
which were executed with loan assistance from World Bank
till 30.9.97. After the closure of World Bank loan
assistance, these two works were executed with state funds
till 31.3.2000. In the year 2000 - 2001, HUDCO loan
assistance to a tune of Rs. 6500.00 lakhs was sanctioned
and a part of amount of Rs.2445.00 lakhs has been drawn
from HUDCO and the expenditure was met out from the loan
amount.
|
|
|
|
|
Now this wing is carrying out
replacement of existing busy level crossing as ROB / RUB
works all over Tamil Nadu. Moreover, Phase I of
Madurai Radial Roads Scheme at a cost of Rs.112.00 crores
is proposed to be carriedout availing HUDCO loan.
|
|
|
|
ON
GOING WORKS :
|
|
|
|
A. ROAD WORKS:
|
|
|
|
For the two spill over road works viz
(i) Southern Sector of Inner Ring Road and (ii) Northern
Sector of Inner Ring Road, the total value of spill over
works is Rs 4051.23 lakhs as on 1.5.2002. Majority of spill
over works comprises L.A cost for Southern Sector of Inner
Ring Roads and
formation of Phase II of this road (Km 0/0 - 5/0) and
formation of small stretches of Northern Sector of Inner Ring
Road
|
|
|
|
The future expenditure will met out
from the loan sanctioned by HUDCO. The approach road for
Tillaiganga Nagar Road Under Bridge is in progress.
|
|
|
|
The Northern Sector of Inner Ring
Road is also in good progress except a small portion for
which L.A. is to be made. Action is being taken to acquire
the lands required.
|
|
|
|
B. ROB / RUB WORKS:
|
|
|
|
Six ROB / RUB spill over works are
at various stages of progress. Of these four works in and
around Trichy are in advance stages of progress and are
excepted to be completed on or before 31.12.2002.
At Chennai, the ROB at MIT
Gate is in good progress and St. Thomas Mount RUB work has
been completed.
|
|
|
|
|
|
PROPOSAL FOR ROB / RUB WORKS TO BE
TAKEN UP:
|
|
|
|
In the ROB / RUB scheme (Cost shared
by Railways and Highways) 36 works were sanctioned in 2000
- 2001 in G.O.Ms. 176, Highways (HQ2) Department dated
5-10-2000 for Rs.513.92 crores, under HUDCO loan
assistance.
|
|
|
|
Out of these works, estimates have
been technically sanctioned for sixteen works and estimate is
under preparation for 9 works. The GAD is under
finalisation for 8 works. For the remaining three works,
the alignment is to be finalised. Work for Morappur (L.C.
No.100) is already awarded and the work has been
started. Tender evaluation for Vengamedu (L.C.
No.37) is under process. Tenders for 14 works have
already been fixed on dates 27-6-2002 (3 works), 5-7-2002
(7 works) and 12-7-2002 (4 works).
|
|
|
|
|
|
MADURAI RADIAL ROADS SCHEME
|
|
|
|
In G.O. Ms. No. 5 Highways (HS1)
Department, dated 10.1.2001 the Government have sanctioned
Madurai Radial Roads scheme comprising of 12 Road Works
and 1 Road Over Bridge across Rail crossing in Ellis Nagar
and a High Level Bridge across Vaigai river near Sakkudi
Village at a total cost of Rs. 112.00 crores. This project
will be carried out availing Loan assistance from HUDCO. These works are to be
executed in and around Madurai city.
|
|